Our clients

We have collected a huge client portfolio over the years, which includes some of the biggest companies in the world. Read on to find out more about our clientele.

£950,000.00

H.J. Heinz – Kitt Green Wigan

Acting as the onsite based, approved asbestos removal contractor, Malrod undertook asbestos removal and decontamination works throughout the Kitt Green site in Wigan, Lancashire.

Heinz Logo

£340,000.00

Harrow Estates PLC

Malrod recently carried out a large scale project in Horsforth, Leeds. To remove a variety of asbestos containing materials to multiple buildings throughout a redundant former chemical industrial site prior to demolition, the project was tailored to the clients requirements and was staged over a 12 months period, each building was completed on time and within budget.

Harrow Estates

£200,000.00 per annum

Mitie Engineering Services – Year 4 of a 5 Year Project

Malrod have been directly employed by Mitie Engineering Services to carry out the removal of asbestos containing materials to a wide variety of commercial sites which include British Telecommunication Sites, council offices (Cheshire East and Cheshire West) and various education facilities throughout the northwest of England, all dealt with in a sensitive nature and  delivered on time.

Mitie

Joseph Holts Brewery

Malrod have been directly employed by Joseph Holts Brewery to carry out the removal of asbestos, encapsulation and remedial works to a wide range containing materials to a wide variety of public houses throughout the northwest of England, all dealt with in a sensitive nature and delivered on time.

Joseph Holt Logo

£160,000.00 per annum

Bolton Council – Over 20 years contract

Acting as the approved asbestos removal contractor, Malrod continues to undertake asbestos removal and decontamination works throughout the housing stock and residential homes of this local authority, each project tailored on an individual basis with the tenants/ staff health and safety at the forefront of the planning, along with the critical times scales and tight budget constraints of a local authority.

Bolton Council

Bolton Royal Hospital

Malrod were directly employed by Bolton Royal to carry out the removal of asbestos residues to a live service corridor, dealing with the task of ‘hot’ work’, satisfying the Health and Safety Executive of a safe system of works to compensate for the increase in working temperatures, utilising rotational working patterns, air management systems and cool vests all dealt with in a sensitive nature and delivered on time.

NHS Logo

Trafford General Hospital

Malrod were directly employed by Trafford General to carry out the removal of asbestos insulating board wall panelling to a redundant office block prior to demolition, dealing with logistics of working alongside ‘live’ areas of the hospital, ensuring a safe system of works all dealt with in a sensitive nature and delivered on time.

NHS Logo

Rochdale Infirmary

Malrod were directly employed by Rochdale Infirmary to carry out the encapsulation of asbestos insulating board lining to an integral lift shaft, prior to refurbishment, dealing with logistics of working alongside ‘live’ areas of the hospital, ensuring a safe system of works, all dealt with in a sensitive nature and delivered on time.

 

NHS Logo